Interior demolition services
Six ways we take out the inside of a building, safely and cleanly.
Selective interior demolition for offices, shops, clinics and homes: we take out what has to go, protect what stays, and leave a clean space for your contractor.
Full detailsWhat it covers
- Drywall and plaster walls, including insulation behind them
- Suspended and drywall ceilings, ducts and fixtures that are being removed
- Non-load-bearing stud and partition walls
- Flooring, base and trim
- Built-in counters, cabinets and millwork
Pulling drywall looks simple until you open the wall. We remove board and insulation in a controlled way so the studs, services and floor are ready for what comes next.
Full detailsWhat it covers
- Drywall on metal or wood studs, single and double layer
- Batt insulation and vapour barrier
- Ceiling drywall where it is being replaced
- Board that has been water damaged and needs to come out
From suspended tile ceilings to taped drywall, overhead work takes planning. We take ceilings down in a safe order and leave the structure and services above exposed and clean.
Full detailsWhat it covers
- Suspended T-bar grid and acoustic tile
- Drywall ceilings and bulkheads
- Light fixtures, diffusers and grilles that are being removed
- Hanger wire and track left behind by earlier work
When a tenant space has to be cleared back to a shell, speed and a tidy handover matter. We strip offices, shops and clinics so your contractor can start the build.
Full detailsWhat it covers
- General contractors starting a tenant improvement
- Property managers preparing a unit for the next tenant
- Business owners moving or renovating
- Design-build teams that need the space opened up
Opening up a floor plan starts with taking walls out. We remove non-load-bearing partitions and their framing, board and insulation, and clear everything out.
Full detailsWhat it covers
- Utilities and services in the wall are identified and made safe by the right trade first
- Board and insulation come off in sections
- Studs and track are taken down and removed
- The floor and the line of the old wall are cleaned up
Our motto is on the van: safe demo, clean results. Cleanup is part of the job, not an afterthought, because a tidy site is a safer site and a faster handover.
Full detailsWhat it covers
- Sorting board, metal framing, ceiling tile and general waste
- Loading and removing debris from site
- Sweeping and clearing floors, ledges and the top of the ceiling grid
- A final walk-through with you or your contractor
Planning a strip-out or renovation? Let's talk.
Tell us about the space, the timeline and what is staying. We will tell you if we are a fit and what the job involves.
